Guides
Delay analysis and EOT guides
Practical, method-based guides for planners, claims consultants and project controls teams who prepare or review Extension of Time claims.
Windows analysis explained: a practical guide for EOT claimsWhat windows analysis is, how to run it step by step with the half-step (AACE 29R-03 MIP 3.3 and 3.4), what you need and the pitfalls to avoid.Read the guide →Windows analysis vs Time Impact Analysis: which method, and whenHow windows analysis and Time Impact Analysis differ, when to use each for an extension of time, and why a cross-check between them makes a claim stronger.Read the guide →EOT claim checklist: 12 checks before you submitTwelve checks for an Extension of Time claim: contract clauses and FIDIC notice periods, programme quality, cause and effect, concurrency, mitigation and the submission bundle.Read the guide →